| First Name | : Waguih | ||||||
| Family Name | : Youssef | ||||||
| Complete Name | : Waguih Youssef Sami Youssef | ||||||
| Personal Data | |||||||
| Date of Birth</td> | : September, 2nd, 1944 | ||||||
| Nationality | : Egyptian | ||||||
| Marital Status | : Married, Identity No. 10506 | ||||||
| No. of Children | : Two | ||||||
| Military Service | : Exempted (44/188/557) | ||||||
| Qualification | : B.Sc. Civil Engineering June 1969 . Alexandria University | ||||||
| Membership | : Syndicate of Professional Engineers - Cairo . Registration No. 1750/2 : American Society of Civil Engineers (ASCE) | ||||||
| Languages |
|
||||||
| Courses Attended | : Project Management 1989 by . Arab Contractors Training Center . ISO 9000 Interpretation and Awareness . Course . ISO 9000 Documentation Program . Internal Audit Course – March & April 1999 . by Arthur Anderson |
| Passport No. | : 150355 Valid till 5-01-2009 |
| Driver License No. | : 179134 Valid till 30-9-2004 |
| Telephone No. | : (202) 6236729 |
| Address in Egypt | : 11, Hussain Shafik El Masry Str. Heliopolis, Cairo, Egypt Apartment No. 11 |
| Zip Code | : 11351 |
| Insurance (National No.) | Internet Home Pages |
| Internet Home Pages | click here to visit my site |
| click here to send your openion |
| EMPLOYER | : Egyptian Arab Contracting Company |
| CITY | : Cairo |
| POSITION | : Planning Manager |
RESPONSIBILITIES:
- Sewer and Water Network
- Sewage Treatment Plants & Pumping Stations
- Electro-Mechanical Installation
- Irrigation Development Projects
- Buildings (Residential & Industrial)
®As Planning Manager
- Analyze the Company’s resources to find the best economic way to exploit it.
- Programming the target Plans for the company’s projects.
- Time Schedules for projects using critical path method, Line of Balance and other techniques.
- Follow-up projects using regular feed-back information coming from sites
- Up-dating the master plan schedule to cope with the unpredictable variations in site.
- Check and analyses the company’s assets: (Manpower, equipment, stored materials, ... etc.)
- Find the most economical methods to exploit these assets and maneuvering it between sites.
- Prepare the company’s pre-qualification and other documents to be submitted with Local and International tenders.
- Evaluation the annual financial status of the company: (Cash flow, prospected projects, value of completed work, bidding capacity, ...etc.)
- 10- Coordinating the different departments of the company: (Procurement, Warehouse, Personnel, Financial Dept. …etc.)
®Acting in the power of “Marketing Manager”
- Composing and design different articles for advertising purposes
- Forwarding these items to different directories, magazines, newspaper
- Design the company home page for the Internet
- Preparing the company’s Brochure.
®As Central Information and Computer Manager:
- Using computer software programs with great efficiency such as:
- (Spreadsheets ,Word processing ,databases, AutoCAD,Primavera ...etc.)
- Compose software programs to be used by personnel affairs department and pay roll department.
®As Training Department Manager:
- Contacting Training Centers to get the available training programs.
- Filter these programs to the company’s needs
- Forwarding the suitable programs to the different department of the company
- Collecting the departments training requirements and preparing the training plan according to budget allocated for this purpose
- Submit the training plan to be approved by the vice-chairman
- Make the necessary reservations for each course
- Follow-up the training results and evaluates its usefulness
®Acting in the power of “Human Resource Manger”From: 16-Nov-81 To: 29-Mar-88
- Collecting CVs from employees
- Categorizing the company’s manpower
- Design Database for the company’s employees
- Preparing the job description for each job title
- Design a score sheets and criteria to evaluate the performance of Engineers
ACTIVITY Pre-Contract : General estimating requirements, Inspection of tender documents, preparation of quantities, rate build-ups, preliminaries. Comprehensive knowledge of conditions appertaining to main contract, Identification of poor clauses and possible disputes. Post-Contract: Preparation of applications to client for monthly payment certificates, quantify changes in volume of work as ordered by client or consultant, the valuation of such variation, Computation of costs incurred by the contractor on any delays or additional work, Re-measurement of completed work, Analysis of site feedback to build up work progress charts From: 18-Mar-79 To: 13-Jan-81
EMPLOYER : Basil-WBTL-Nassar Joint VentureFor Design And Construction PROJECT : Helwan New Communities Value of Work : 160 million US Dollars Financed by USAID POSITION : Deputy Chief Quantity Surveyor
ACTIVITY Initially I was assigned to a project for constructing a 25 Km Channel to protect New International Jeddah Airport from inclement weather, my duties principally included checking work in progress such as shuttering, reinforcement steel, quality of concrete. I was latertransferred to Riyadh where my duties were further increased to those of quality controller and Civil Eng. on a large dual highway contract, which entailed the construction of complex bridge interchanges where pre-stressed conc. technology was used. From: 31-Aug-78 To: 30-Dec-78
EMPLOYER : Dar Al-Handassah . Engineers & Architects LOCATION : Jeddah - Riyadh POSITION : 1 - Site Inspector2 - Material Engineer3 - Civil Engineer
From: 01-Nov-76 To: 17-Jul-77
EMPLOYER : Allam-Jarvis - Joint Venture CITY : Cairo POSITION : Site Engineer ACTIVITY Construction of military factory.
ACTIVITY The overall administration of the construction of: an oil storage terminal, which ultimately supplied the southern part of Saudi Arabia. My duties principally included Programming, Management of labor and plant resources required in carrying out Civil Work aspect of this contract, which entailed excavation, in-situ concrete, drainage and mechanical works. From: 14-Feb-75 To: 31-Oct-76
EMPLOYER : Saudi constructioneers establishment CITY : Najran - Saudi Arabia POSITION : Project Engineer & Manager
ACTIVITY Initially employed as a Site Eng. for a project entailing the construction of approximately 40Km. of dual highway, together with ancillary culvert construction. My duties, during the contract, were extended to include the function of Project Engineer, responsible for the monthly evaluation of work carried out, control of sub-contractor’s accounts, measurement from drawings, etc. In addition to the foregoing I was also responsible for the quality control, laboratory testing of materials. From: 18-Ian-74 To: 08-Feb-75
EMPLOYER : Intergreen Construction Co. CITY : Riyadh - Saudi Arabia POSITION : 1 - Quantity Surveyor2 - Material Eng.3 - Project Eng.
ACTIVITY Construction of a rest house for the Army Officers in Cairo Railway Central Station. From: 15-Ian-73 To: 15-Jul-73
EMPLOYER : Atlas Company for Construction CITY : Cairo -Egypt POSITION : Project Engineer
ACTIVITY Senior member of a consultant’s team engaged in the structural design of a large reinforced concrete pier forming part of a marine complex near Jubail, Saudi Arabia. I also designed steel over-crossing, carrying extinguisher pumps, for ARAMCO in their Khobar Plant. From: 01-Mar-70 To: 31-Oct-72
EMPLOYER : General Engineering Co.. JENCO-FAMCO CITY : Khobar - Saudi Arabia POSITION : Design Engineer
ACTIVITY
EMPLOYER : Execution Department of Iron & Steel Complex. JENCO-FAMCO CITY : Helwan - Cairo POSITION : 1 - Chief Surveyor . 2 - Site Eng
- Setting out Roads, Railways, Pipelines, Electrical cables, Galleries, Belt Conveyors, Building center lines.
- Triangulation- Leveling- Topography.
- Earth Control